Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues, Unpublished PhD Thesis, TRITA-TSC-PHD, KTH Royal Institute of Technology.

Anund Vogel, J (2020) Incentivising Innovation in the Swedish Construction Industry, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Borg, L (2015) Procurement contracts, innovation and productivity in the construction sector: Five studies, Unpublished PhD Thesis, TRITA-FOB-DT, KTH Royal Institute of Technology.

Brunes, F (2015) Essays on behavioural economics and cost overuns, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level, Unpublished PhD Thesis, TRITA-TSC-PHD, KTH Royal Institute of Technology.

Clausen Mork, J (2012) Dealing with uncertainty, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Eliufoo, H K (2005) Knowledge creation and transfer in construction organisations in Tanzania, Unpublished PhD Thesis, Trita-BFE, KTH Royal Institute of Technology.

Faith-Ell, C (2005) The application of environmental requirements in procurement of road maintenance in Sweden, Unpublished PhD Thesis, Trita-LWR. PHD, KTH Royal Institute of Technology.

Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Gohardani, N (2014) An approach towards sustainable building, Unpublished PhD Thesis, TRITA-BYTE, KTH Royal Institute of Technology.

Högberg, L (2014) Building sustainability: Studies on incentives in construction and management of real estate, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.

Hedborg, S (2022) ”It’s in the between”: Inter-Project Organising in Project Ecologies, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Irumba, R (2015) Modelling of construction safety performance and housing markets in kampala, Uganda, Unpublished PhD Thesis, Trita-KTH-CEFIN-DT, KTH Royal Institute of Technology.

Jägbeck, A (1998) IT support for construction planning: A system design based on integrated information, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Karhu, V (2001) A generic construction process modelling method, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

  • Type: Thesis
  • Keywords: process; modelling; generic; method; database
  • ISBN/ISSN:
  • URL: http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-3246
  • Abstract:
    A variety of modelling methods has been used to model construction processes and projects, either during normal project planning or for process re-engineering efforts or research. One common method, which is widely used by construction industry practitioners, is scheduling. In addition to schedules, some companies have used a simple box-and-arrow method, which graphically resembles schedules, for analysing their working processes. More formal methods such as IDEF0 havebeen used in re-engineering projects and by researchers. All these methods are limited in scope and cannot be used to model all the aspects of the processes that practitioners are interested in. A new generic construction process modelling method, GEPM, was developed to overcome the deficiencies of the current methods. GEPM uses object-oriented principles, and has borrowed features, such as activity, task, and temporal dependency, from methods like IDEF0 and scheduling. GEPM is flexible in the sense that the conceptual model can be changed to achieve additional special features. This capability is also supported by the database implementation, which enables users to interact with the developed process models through views that represent partial models. The views support the IDEF0, scheduling, and simple flow methods. There are, though, rules for how to convert between the partial models through views. The evaluation of GEPM showed that more modelling features, i.e. modelling power, are obtained in comparison with the earlier methods. One of the essential features of GEPM is the distinction between activities and tasks. Activities define how an action will be carried out, generally using predetermined inputs to achieve a predetermined output, whereas tasks are activities with additionally specified starting and finishing times, duration and location. Moreover, a task has a type-attribute that refers to an activity where its overall template is defined. Before the actual evaluation, case material from a real project was preliminarily tested with GEPM along with the prototype application. It turned out that some additions were needed to the conceptual model of GEPM and to the prototype application. GEPM can be used for process improvement, process management, and for enhancing communication in a construction process. One usage scenario for GEPM is to define quality systems and reference models, using the activity sub-model and storing the results in the GEPM database. A project-specific model can be derived from the reference model using conversion rules, and it eventually turns into a project specific-schedule with tasks.

Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice, Unpublished PhD Thesis, Trita-IEO, KTH Royal Institute of Technology.

Laitinen, J (1998) Model based construction process management, Unpublished PhD Thesis, , KTH Royal Institute of Technology .

Leiringer, R (2003) Technological innovations in the context of public-private partnership projects, Unpublished PhD Thesis, TRITA-IEO, KTH Royal Institute of Technology.

Lindblad, H (2019) BIM in translation: Exploring client organisations as drivers for change in construction, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Lindfors, C (2003) Process oriented information management in construction, Unpublished PhD Thesis, TRITA-IEO, KTH Royal Institute of Technology.

Marteinsson, B (2005) Service life estimation in building design: A development of the factor method, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Mirzadeh, I (2014) More roads for the money, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Nyström, J (2007) Partnering: Definition, theory and evaluation, Unpublished PhD Thesis, Trita-BFE, KTH Royal Institute of Technology.

Parsanezhad, P (2019) Towards a BIM-enabled facility management: Promises, obstacles and requirements, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings, Unpublished PhD Thesis, Meddelande. Institutionen för byggvetenskap, KTH Royal Institute of Technology.

Schönbeck, P (2022) Data based configuration decisions in hospital construction projects, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications, Unpublished PhD Thesis, Trita-BKN. Bulletin, KTH Royal Institute of Technology.

Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Uggla, G (2021) Model and reality: Connecting BIM and the built environment, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Unger, C (2006) Industrialised house building: Fundamental change or business as usual?, Unpublished PhD Thesis, Trita-IEO, KTH Royal Institute of Technology.

Uttam, K (2014) Seeking sustainability in the construction sector: Opportunities within impact assessment and sustainable public procurement, Unpublished PhD Thesis, TRITA-LWR. PHD, KTH Royal Institute of Technology.

Vass, S (2017) The business value of BIM: Elaborating on content and perspective, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.

Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.

Zika-Viktorsson, A (2002) The industrial project. Studies of the work situation of project members, Unpublished PhD Thesis, Trita-MMK, KTH Royal Institute of Technology.